Engineers with Answers

Electric Motor

A three-phase electric motor used in a spray booth lost one of its phases in an earlier fire. Despite this fact, the owner placed the motor back into service. One week later, paint mist was ignited by a fault in the motor, which resulted from the earlier degradation of the motor windings. This culminated in a fire, which destroyed the entire building. Packer Engineering determined the owner of the facility had ignored all national and local electrical codes requiring an explosion-proof motor in this application, plus he had continued to use the damaged motor. These two errors, combined with an inadequate ventilation system and poorly designed sprinkler system, led to extensive property loss.

Electrical Fire Investigation

A large restaurant caught fire and burned to the ground. The owner claimed electrical arcing in a piece of conduit started by a circuit breaker malfunction caused the fire. Packer Engineering was hired to investigate the allegation. By simulating energized electrical cables inside of conduit and performing phase-to-ground fault tests, our findings disproved the proposed theory. When simulating their fire hypothesis, the fault did not sustain itself. The physical evidence showed a case of arcing through char was a result of the ongoing fire, and not the cause of the fire.

Tantalum Capacitor

Packer Engineering examined a cross-sectioned tantalum capacitor that had been experiencing intermittent performance, while soldered to a printed circuit board (PCB) assembly for an automotive safety control system. The Scanning Electron Microscope (SEM) revealed the source of the malfunction was the absence of a welded connection internal to the construction of the capacitor. We further determined the manufacturer of the capacitor had changed manufacturing processes to one which was susceptible to this type of failure mode and had inadequate quality control procedures in place. Through testing and process control documents, we established the breadth of the affected manufacturing lots and the timeframe in which the malfunction could be expected to occur.

Latest News

Green Fuels Depot A Packer Engineering Project

The City of Naperville, Argonne National Laboratory, the College of DuPage, Packer Engineering, Inc., and the Center for Application Based Learning (CABL) are working together to accomplish the construction and operation of the Green Fuels Depot demonstration program....

View All News >

Rapid Response

At your service 24 hours per day, worldwide.

Learn More >

Our Staff

Our staff assists clients with problem solving and technical issues.

Learn More >

Submit a Project

Please call 800.323.0114 or fill out the Pre-Project Request Form